The building features a lavish 2-story entry lobby referred to as the “corporate living area”. Prefabricated wall units with pre-punched windows were produced off site and delivered within days of the scheduled installation.

Once on site, the units were fastened into the window opening within a matter of minutes.

This process shaved weeks off the installation schedule and eliminated unnecessary packaging and waste on site. A notable aspect of the buildingÂ’s sustainability is energy performance, optimized to be 21% above current construction standards.

genaGranite
The building features a lavish 2-story entry lobby referred to as the “corporate living area”. Prefabricated wall units with pre-punched windows were produced off site and delivered within days of the scheduled installation. Once on site, the units were fastened into the window opening within a matter of minutes. This...